New septic systems, conventional and aerobic

A new on-site system starts with the soil, not with a preference for the cheaper tank. This site does not evaluate lots or install systems. It sends the request to one company that holds the license to do that work.

The soil decides first

TCEQ requires a licensed site evaluator or a professional engineer to evaluate the site before an on-site sewage facility is built. The state table for a standard absorptive drain field — the conventional system — marks both very coarse sand (class Ia) and clay (class IV) as unsuitable. The field also needs about two feet of suitable soil below the disposal media to groundwater and to a restrictive horizon. East Texas lots often fail that test because a loamy surface sits on clay. Smith County’s most widespread soil, Cuthbert, is described in the county survey as firm red clay within inches of the top.

Where a conventional field is unsuitable, designers move to a secondary treatment system, usually an aerobic unit, with surface spray or subsurface drip. Spray is the common, less expensive dispersal method. Drip costs more and shows up where spray is a bad fit: tight lots, heavy trees, or shoreline setbacks around Lake Palestine and Lake Athens. Neither is a lifestyle choice. The permitting authority accepts or rejects the design.

Sizing and paperwork

Residential systems in Texas are sized from the number of bedrooms and the living area, under 30 TAC Chapter 285, not from how many people you think will live there. Adding a room after the permit can mean the system is undersized on paper. Tell the designer the plan you will actually build.

The permit comes from TCEQ or the local authorized agent, which around here is usually the county. Bullard (Smith and Cherokee), Kilgore (Gregg and Rusk), and the Longview metro (Gregg and Harrison) can put two neighbors in different offices. A new aerobic system also needs a signed initial two-year service policy with a licensed maintenance provider before it is approved for use. That policy is part of the installation, not a later upsell. What the contract has to contain is on the aerobic page.

New house versus a replacement

A vacant lot and a house with a failed field are different jobs that both get called “a new system.” On a vacant lot, the evaluation should happen before the slab and the driveway freeze the only good disposal area. On a replacement, the old tank location, trees, and whatever was permitted in 1988 constrain the new design. A field that failed may not be allowed to be rebuilt in the same way. Budget for a design, not for a copy of the neighbor’s system.

What to send with the request

  • Town and county, if you know which side of a county line you are on
  • New construction or a replacement
  • Bedroom count and roughly how big the house is
  • Whether anyone has already done a site evaluation
  • Lake lot, tight lot, or open acreage
  • When you need the system permitted, not just “soon”

How the request moves

  1. You send the form. There is no fee from this site.
  2. One independent, locally licensed company receives the request. It is not sent to a list of contractors.
  3. They follow up by phone or email, using the time you picked when they can.
  4. You get a written quote for the property. Dollar figures on this website are only typical ranges.
  5. You decide whether to hire them. This site does not book the work or take payment.

Common questions

Why would a lot be turned down for a conventional drain field?

TCEQ’s system table treats both very sandy soil (class Ia) and clay (class IV) as unsuitable for a standard absorptive drain field. The field also needs enough depth to groundwater and to a restrictive layer. East Texas lots often have a sandy-looking surface over clay, so a surface glance is not a design. A licensed site evaluator or a professional engineer has to evaluate the lot before a system is built.

Who evaluates the soil?

A site evaluator or professional engineer licensed for on-site sewage work. The permit comes from TCEQ or, more often here, the local authorized agent — usually the county. This website does not evaluate soil or pull permits.

What does a new system cost?

Published guides put a conventional installation around $3,500–$10,000 and an aerobic installation around $8,500–$20,000. Many Tyler-area 3–4 bedroom aerobic spray systems are discussed nearer $8,500–$13,000 before drip or a hard lot. Design, permit fees, and the initial service policy may be inside or outside a bid. Compare itemized quotes. See cost and FAQ.

What is the initial two-year service policy?

For an aerobic system, the owner has to give the permitting authority a signed two-year service policy with a licensed maintenance provider before the system is approved for use. For a new single-family home, that clock starts at the builder’s sale. It is part of installing the system, not an optional add-on.

Who chooses conventional, spray, or drip?

The soil evaluation, the lot size, setbacks, and the permitting authority. Spray is common in this region because clay and small lots rule out a long drain field. Drip costs more and shows up on tight, wooded, or waterfront lots. The designer proposes a system the county can permit. A preference for the cheaper option does not override the soil.

Related: aerobic rules, cost and FAQ, town pages.

Request an install quote

Share the town, the bedroom count, and whether this is a new build or a replacement. One licensed company follows up.